The Plant

The plant itself is 80 m x 80 m and will be located at the rear of the Golden Cockerel Processing Plant at Hillview Rd Mt Cotton. It is being built on a site where existing chicken sheds currently stand and will not be obviously visible from Mt Cotton Rd – less so than the existing sheds.

The final design has been arrived at, modeled and agreed upon by the local community. The design has been arrived at specifically for the terrain and is not a replica.

the-plant-2

Artists impression of the plant on site

The final design has been arrived at, modeled and agreed upon by the local community. The design has been arrived at specifically for the terrain and is not a replica.

Cleveland Power’s Mt Cotton design complies with ALL Local, State and Federal laws.

It is anticipated that the Plant will produce approximately 60,000 MW hours of electricity per year. In so doing it will reduce green-house gases by up to 120,000 tonnes per year.

Click here to view the plant drawings and plans

Cleveland Power- Green renewable energy from Redland City